Grid Precon

Commercial electrical estimating

Electrical takeoffs
and pre-bid
scope audits.

Hand off your drawing set. Get an editable Excel takeoff, labor hours and a list of scope conflicts to resolve before bid day.

First project free up to 5 sheets · Flat fees thereafter

Electrical plan detail2 / E-101r
Three elevator pits with lighting, receptacles and sump pump connections marked on the drawing.
Fairmont State University · E-101rElevator pit takeoff
Alternate #1
Pit lights
09
GFI outlets
03
Pump outlets
03

The bid package

What lands on your desk

Excel workbook

Itemized takeoff

Review quantities, material allowances and labor hours by system. Adjust rates in unlocked formulas and see base bid and alternates roll up separately.

Scope memo

Drawing cross-check

See where panel schedules, mechanical sheets and electrical notes disagree. Each finding identifies the sheet and what the estimate carries.

RFI log

Questions for the engineer

Use draft RFIs to clarify missing feeds, shared breaker spaces and trade responsibilities before your team submits the bid.

Sample audit · RFB-463

Fairmont State University elevator replacement

Which bid carries the nine pit lights?

The takeoff counts three G01 fixtures in each of three elevator pits. Note 11 puts the pit devices under Alternate #1. If only the base bid is awarded, those nine fixtures stay out of the base scope.

Sheet E-101r · Coded Note 11
Note 11 assigns all elevator pit devices, including receptacles, light fixtures and lighting devices, to Alternate Bid #1.
Download the audit memo PDF ↓

Takeoff workbook · Item 1.1

G01 · Vaportite LED fixture

Quantity
9 fixtures
Material allowance
9 × $65 = $585
Installation labor
9 × 0.75 hr = 6.75 hr
Bid allocation
Alternate #1
Fairmont bid breakdown
PackageHoursDirect cost
Base bid103.55$13,049
Alternate #148.70$6,212
Combined152.25$19,261

Material and labor only. The contractor sets final pricing and markups.

Fairmont · RFI-02 · Alternate #1

Does the bid need a second breaker?

Sheet E-101r · Coded Note 12
Note 12 calls for one new 20A single-pole circuit breaker in Panel RP under Alternate Bid #1.

The note lists one 20A single-pole breaker in Panel RP.

Sheet E-001r · Mechanical Equipment Schedule
Rows CU-2 and SFC-2 both list 30A/2P protection on Panel RP, circuits 33 and 35.

Both CU-2 and SFC-2 show 30A two-pole protection at the same RP spaces, 33 and 35.

Question for the engineer Should Alternate #1 include a new 30A two-pole breaker for RP spaces 33 and 35 in addition to the 20A breaker in Note 12?

Pending clarification, workbook item 4.6 carries one additional breaker in Alternate #1 at a $65 material allowance.

Pricing in USD

One flat fee per project.

You know the scope, fee and delivery date before work starts. No hourly billing.

First project

$0

Your entire first project is free when the drawing set has up to 5 sheets. Includes the editable takeoff, scope memo and RFI log.

Email about my free project ↗

Paid project

from $350

Send the set for a fixed quote. Small packages typically take 2–3 business days after scope confirmation. Larger sets are quoted individually.

Email for a fixed quote ↗

Email your drawing set

The buttons open your email app. Attach your sheets or include a plan-room link and your bid deadline, then press Send.